Simandou: year one in production

110 km of hills in south-eastern Guinea, presented as among the world's largest high-grade iron ore reserves (specialist press, to be corroborated): the project entered production in 2025 after 30 years of waiting.

● Official — MMG N°302025 timelineUpdated 31 Oct 2026
ShareWhatsAppTelegramFacebook

Contents

Numbered sections — jump in or read in order

01 The project in figures

110 km
Of mountain range
Simandou — Forest Guinea
650 km
Transguinean railway
MMG — 100% complete in 2025
1.53 Mt
Iron ore produced in 2025
MMG — first year
11/11/2025
1st commercial shipment
MMG — Moribaya port

02 2025 timeline

  • Transguinean railway: 650 km of track, 100% complete; ~20 locomotives received by the TransGuinean Company (CTG).
  • 11 November 2025: first commercial shipment of Simandou iron ore (11h11 — a nod to the deposit's name).
  • Moribaya port: two operators load there — WCS and Rio Tinto Simfer.
  • 2025 production: 1.53 Mt — gradual ramp-up towards full capacity.
  • Local content: WCS local-content forum as early as June 2023; infrastructure clauses (rail, port) written into the conventions.
The 'Chinese model' of negotiation: the SMB experience (Dapilon-Santou railway, 135 km, delivered turnkey in 2021) shows infrastructure can be negotiated into conventions — a precedent for the next deposits.

03 The players

PlayerRole
Winning Consortium Simandou (WCS)Co-developer — north block, infrastructure
Rio Tinto SimferCo-developer — south block
BaowuStrategic investor (Chinese steel)
Chinalco / Aluminium Corp. of ChinaReference shareholder
TransGuinean Company (CTG)Railway operator
Guinean State15% stake in the mining block (convention)

Sources: MMG N°30, specialised press — detailed stakes to be checked against published conventions.